top of page

COTTAGE - NORTH WALL

The upper floor was accessed by a non-descript earth ramp. As we were making out way around the ground floor, pointing the very washed out walls, and assessing the condition of the internal side of the wall behind the ramp, we thought the stonework hidden behind the ramp would be particularly bad (spoiler: it wasn't as bas as other areas). The decision was made to dig the ramp up, address the wall behind and, as the ground is a little higher here, put in a French drain to keep posture away from the wall. While doing so, we discovered that the "ramp" was actually a somewhat collapsing stair. We decided to keep the access away from the wall, creating a "bridge", under which we'll be able to conceal the bathroom extract. The slab used was from the original "bridges" over the races, now replaced with concrete, and the stair / planter developed somewhat organically, using the stones from the ramp. We didn't really know how it would look until it was complete.

 

August 2021

August 2021

March 2023

March 2023

April 2024

April 2024

July 2024

July 2024

August 2024

August 2024

September 2024

September 2024

October 2024

October 2024

November 2024

November 2024

December 2024

December 2024

May 2025

May 2025

June 2025

June 2025

July 2025

July 2025

  • Facebook
  • Youtube
  • Instagram

©2022 by Rothaí. Proudly created with Wix.com

bottom of page